TRACK FACTS

SYDNEY DRAGWAY TRACK FACTS


Opened in 2004, Sydney Dragway is an amazing multi-million dollar purpose-built facility, specifically designed to handle large-scale outdoor events.

Built-                                 2003/04

Opened -                          2004

Capacity -                     Approx. 400 Race Teams simultaneously

                                          40,000 Spectators

First Major Event-       Summernationals, February 2004

Elevation -                    72 m above Sea Level

Track Configurations-¼ Mile / 402 meters

                                          1/8th Mile / 201 meters

Construction -            The Race Track was completely replaced in 2020

                                         All Concrete Race Track to 60 metres after ¼ Mile Finish Line

                                         Uphill 600-metre bitumen / asphalt Braking Area

                                         100 m Gravel Trap with Dual Catch Net

FAQ 

Something you need to know? Check out our Frequently Asked Questions!!

WANT TO STAY UPDATED? 

Then join our mailing list!

© Copyright 2029 Sydney Dragway  | 02 9421 0700  |  Privacy  |  Websites with MOBLE